What it is worth
Your numbers,
not ours.
Every figure below is one you enter. We do not know your floor, so we are not going to tell you what it costs. Put your own numbers in and the arithmetic is yours to check.
What that work costs you a year
₹46,20,000
1,848 engineering hours a year
18 rig days a year lost to something caught late
If it removed some of that
40%₹18,48,000 a year, or 739 hours back to engineering.
The working
- watching · 6 eng × 6.0 h/wk × 46 wks
- 1,656 h
- evidence · 16 h/mo × 12
- 192 h
- total × ₹2,500/h
- ₹46,20,000
- rig time · 2/mo × 12 × 18 h ÷ 24
- 18 days
46 working weeks rather than 52, for leave and the weeks nothing runs. No figure here comes from us. We publish measured SK-01 numbers only once the first units run, which is why this page asks you rather than tells you.
Take it to your manager.
On our floor, watching runs and assembling evidence takes about 1,848 engineering hours a year, which is about ₹46,20,000. We also lose about 18 rig days a year to problems caught late.
Bring your own number to the conversation.
If the figure above is large enough to be worth an hour of your time, the next step is one rig, read-only, and a floor view in weeks.